The Last Planner® System simulation for construction teams info@villego.com

Lean construction blog

Practical posts for superintendents, project engineers and trade foremen who use the Last Planner® System on real projects.

This lean construction blog is written for the people who run the weekly planning meeting and live with its results. Each post takes one problem you'll recognize from site, such as a pull planning session that runs out of time, a huddle that turns into a status report or a trade that keeps arriving before its area is ready. Then it works through the problem with a hypothetical example, the research behind the advice and steps you can try on your next project.

New to the system? Start with the Last Planner System guide, then read about pull planning and the weekly work plan. If you'd like your team to practice before the project does, the Villego simulation lets them build a small villa twice and compare the numbers.

All posts

Villego workshop room with participants in hard hats, build tables and a planning wall

Construction superintendent training for reliable field planning

Build planning and facilitation skills through a 90-day training plan, coached foreman practice, and honest measures of promise reliability.

Read the post →
Pull planning wall with colored sticky notes arranged in a grid of trades and days

Location based scheduling and LPS: what each sees

A worked apartment-building example shows how flowlines reveal crew movement and how Last Planner turns that information into workable commitments.

Read the post →
Workshop participants placing sticky notes on the planning wall together

How to run a pull planning session as the facilitator

A facilitator’s guide to invitations, pre-work, room setup, a 150-minute agenda, difficult conversations, and the records your team needs afterward.

Read the post →
The nearly finished Villego villa on its green base plate, with plan sheets nearby

Takt planning and Last Planner on the same project

Takt sets the rhythm by area; Last Planner makes the work ready and secures commitments. See a worked building example and where a fixed beat needs a different approach.

Read the post →
Participants placing bricks on the Villego villa, with plan sheets on the table

Subcontractor coordination without the Monday blame game

Move coordination from Monday blame to trade-owned handoffs. A practical weekly routine connects ready work, crew commitments and learning from missed promises.

Read the post →
Participants in caps building the Villego villa together at the table

Construction team building activities that improve planning

Choose an activity that helps trade partners plan together, then carry the shared experience into your first pull plan.

Read the post →
Hands building the Villego villa on a green base plate next to the plan drawings

Root cause analysis construction teams can use after a missed promise

Move from a missed weekly promise to a tested countermeasure. Use reasons for variance, 5 whys, and fishbone diagrams without turning the review into blame.

Read the post →
Workshop team gathered around the build table and the finished villa between rounds

Daily huddle: protect your weekly construction plan

A short construction-site huddle checks weekly promises against actual progress. Use this agenda to confirm handoffs and act on tomorrow's risks.

Read the post →
Participant writing yellow sticky notes for the pull plan at the build table

Pull planning sticky notes: a color code everyone can read

Use trade colors and separate symbols to make your pull planning wall readable. Standardize note fields, board layout and the record you share afterward.

Read the post →
Close-up of hands adding colored bricks to the Villego villa

Construction productivity starts with reliable plans

Reliable weekly plans give crews ready work. Use independent productivity research and practical checks to reduce waiting, rework, and broken handoffs.

Read the post →
Participants building the villa while the round timer runs on the projector screen

Lean construction books: a Last Planner reading order

Start with a practical Last Planner paper, then read the original research and lean foundations. Match each reading to a site exercise and your role.

Read the post →

Teach the Last Planner® System in one day

One Villego kit runs a workshop for 7 to 15 participants. Ask us about kits, languages and delivery.

Order a Villego kit